Page 1 of 1

Excavation as a mechanic

Posted: Mon Mar 13, 2023 2:06 pm
by eyal282
While my extension is pumping work, I believe excavation should have a proper zone ( like the banish pile, placed on top of the deck )
Keep in mind, making the main deck the excavation zone itself, where face-up is the excavated and face-down is the deck, won't work because parasite paracide.